Southern California Edison GO4 Outdoor Gym Improvement was a design build project to upgrade the existing 1,500SF outdoor fitness area. MSH worked with the architect and engineers to provide construction documents and navigate the plan check process with the City of Rosemead. The project included the installation of a new steel fence and gate to secure the area, overhead canopies to provide shade, new entry glass double doors and new outdoor fans. A new outdoor storage room was built along with framing and backing support for a wood slat façade & pull up bars.
Category Archives: Design Build
Southern California Edison Mountain View Storage Building was a design build project that consisted of a new 8,000SF storage facility. The design process consisted of working with the architect and engineers to create a conceptual design that brought the clients vision alive and stayed within the cost parameters. MSH worked with the architect to navigate the entitlement and permitting process with the City of Redlands. The final product was a pre-engineered metal storage building to match the adjacent maintenance building on site.
Santa Ana Service Center is a design build project that consist of a new 4,656SF logistic building, 6,480SF truck parking canopy and infrastructure for 60 new EV chargers. The final product is to be a pre-engineered metal shop building that will house a shop area, secured tool storage room, unisex restroom, security room, electrical room, telecom equipment room and janitor’s closet. The new truck canopy is to cover 7 trucks at a time. New electrical conduit is to be run underground to provide future electrical for 60 EV charging stations. The new Logistic Building meets LEED Gold Standards.
Ridgecrest Service Center Garage Expansion is a design build project that consists of a new 12,165 sf garage building with 2 truck repair bays, attached single wash bay, office, break room, locker/shower room, restroom, janitors’ closet, IT/ telecom room, security room, electrical room, battery charging room, used battery storage room, equipment rooms and new mezzanine for parts storage. The 2 new truck repair bays will be outfitted and installed will all the SCE requested special garage equipment including lifts and a 10-ton bridge crane.