Overview:
Provided stand-by power center consisting of demolition of existing fuel system, earthwork, cast-in-place concrete perimeter walls, vault and equipment pads, electrical primary and secondary duct banks, power signal and controls distribution, equipment installation, fuel piping system, start-up commisioning, and close out.
|

Poured-In-Place Wall & Electrical Vault
|